 |
|
Support this web page by clicking the bookmark button above.
|
|
 |
 |
|
Email Bob here - please include your phone number and Mapquest address
|
 |
 |
|
These are pictures of a recent Finished Basement Remodeling located in Macomb Township Michigan. These pictures show the job from start to finish, followed by a movie after the owner moved in. The owner took care of the painting and flooring. As usual it took about about 5 weeks. What do you think? email me.
|
|
|
 |
 |
 |
 |
 |
 |
 |
 |
|
We start the project by loading 90% of the material that we will need before we start. Studs, drywall, ceiling panels, tools, lighting, etc.
|
|
|
|
Then we build all the partitions
|
|
|
|
Then we start the framing under the heat ducts and I-Beams. Meanwhile we sweep up every day.
|
|
|
We run the wiring behind the walls along with the fiberglass insulation. We use no special vapor barriers in order to let any moisture evaporate.
|
|
|
|
Drywall is then installed over the top of the studs. Screws are used in most of it rather than nails.
|
|
|
|
In areas designated unfinished this is how they look. We don’t do any finishing here.
|
|
|
|